logo
Mesaj gönder
Guangzhou Qireal Machinery Equipment Co., Ltd. 86--13826061887 Sarahlee68@163.com
Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673

Excavator Spare Parts Diesel Engine Camshaft For C9 242-0673

  • Vurgulamak

    excavator components

    ,

    excavator engine parts

  • Uygulama
    Kamyon, ekskavatör, otobüs
  • Ürün adı
    Eksantrik
  • model
    C9
  • Motor tipi
    Dizel
  • Malzeme
    Metal
  • Şart
    Yeni
  • paketleme
    Nötr ambalaj
  • Menşe yeri
    Çin
  • Model numarası
    C9
  • Min sipariş miktarı
    1 parça
  • Fiyat
    Anlaşılabilir
  • Ambalaj bilgileri
    Nötr ambalaj
  • Ödeme koşulları
    L / C, D / A, D / P, T / T, Western Union
  • Yetenek temini
    100pc / hafta

Excavator Spare Parts Diesel Engine Camshaft For C9 242-0673

Excavator Spare Parts Diesel Engine Camshaft For C9 242-0673

 

Our camshaft factory is a leading manufacturer of auto camshafts.

Our factory is a leading manufacturer and exporter of auto engine parts-camshaft. We produce and supply a wide range of connecting rod for cars and trucks:

 

Product Name: Camshaft
model: C9
Size: standard size
OEM NO. as original
time of delivery if instock 7-15 days or more quntity as negotiation
Engine type: for
Warranty: 6 months
Features

New

 

 

Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 0Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 1Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 2

 

Packaging & Shipping
Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 3Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 4Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 5Excavator Spare Parts Diesel Engine Camshaft For  C9 242-0673 6

About our packing

1.Neutral bag+foam bag+neutral carton(pallet) or customized packing.

2.We accept customerized brand packing if the quantity is good.

3. then it will be put into box, and all cam shafts are packed in cartons finally.

4.All of the products are well packed.

5.Delivery time is 15-60 days as normal.